Preparation work
Overview
| | | Care Point: | If required, make sure the suspension system has been depressurised before disconnecting Li-ion battery.
|
| | | 1. | Connect McLaren Diagnostic System (MDS), proceed to Diagnostic Toolbox within Chassis Control Unit (CCU).
| | | 2. | Access sequences.
| | | 3. | Carry out APMU Maintenance Start.
| | | | | Care Point: | If required, make sure Electric Parking Brake (EPB) has been disengaged with McLaren Diagnostic System (MDS) before disconnecting Li-ion battery.
|
| | | 4. | Connect McLaren Diagnostic System (MDS), proceed to Diagnostic Toolbox within Electronic Stability Program (ESP).
| | | 5. | Access sequences.
| | | 6. | Carry out EPB Enter Maintenance Mode.
| | |
Disconnect Li-ion battery
| | | Care Point: | Make sure vehicle is in sleep mode before disconnecting Li-ion battery.
|
| | | 1. | | | | 2. | Disconnect ground cable (2) from Li-ion battery (3).
| | | 3. | Secure ground cable (2) away from battery terminal.
| | | 
|
Connect Li-ion battery
| | | Care Point: | Before tightening clamp (1), make sure it is positioned as far down battery terminal as possible.
|
| Care Point: | Once clamp is torqued, perform a pull test.
|
| Care Point: | Make sure any battery chargers are disconnected when performing Steering Column Calibration, either by the MDS sequence or when prompted by the Instrument Cluster.
|
| | | 1. | Install components in reverse order.
| | | 2. | Reset date/time on instrument cluster.
| | | | | Care Point: | If required, re-engage Electronic Parking Brake (EPB) with McLaren Diagnostic System (MDS).
|
| | | 3. | Connect McLaren Diagnostic System (MDS), proceed to Diagnostic Toolbox within Electronic Stability Program (ESP).
| | | 4. | Access sequences.
| | | 5. | Carry out EPB Exit Maintenance Mode.
| | |