Preparation work
Remove floor panel - Engine
| | | Care Point: | Record the bolt positions as they vary in type.
|
| | | 1. | | | | 2. | | | | 
|
| 3. | | | | 4. | Remove floor panel - Engine (4).
| | | 
|
| Care Point: | Only hand tighten the fixings at this stage.
|
Install floor panel - Engine
| 1. | Loosely install the floor panel - Engine.
| | |
|
| 2. | Make sure that the breather pipe (1) is pushed through the hole (2) in the floor panel.
| | | 
|
| | | Care Point: | Make sure the tunnel panel is correctly aligned.
|
| | | 3. | Install the floor panel - Engine and do the tightening torque sequence.
| | | 4. | Install components in reverse order.
| | | 
|